The performance improvement plan is on trial in India. Through 2026, PIPs at some of India’s largest employers have made national news. Increasingly, employees read the three letters as a scripted exit rather than a rescue. That reputation is earned in some companies and unfair in others. This article explains what a performance improvement plan is actually for. It answers the question of the moment: is a PIP an exit tool? It then covers when to put an employee on a PIP, and the PIP process in India, step by step. Finally, it gives three tests for how to design a fair PIP that would survive scrutiny.
What a performance improvement plan was meant to be
A performance improvement plan is a structured, time-bound agreement between a manager and an employee. It applies when performance has fallen below the standard for the role. On paper, it has four parts. These are the specific gap, the target, the support the company will provide, and the review date. Done honestly, it is the most respectful tool in performance management. It replaces vague dissatisfaction with a clear, achievable path back.
However, a PIP only works when success is a genuine outcome. The moment a performance improvement plan is issued with the end already decided, it stops being a management tool. It becomes paperwork for a decision taken elsewhere. Employees sense that instantly. Consequently, the tool’s reputation in India today says less about the instrument and more about how it has been used.
Is a PIP an exit tool? What 2026 has exposed
The question “is a PIP an exit tool?” is being asked louder in India than anywhere else. This year supplied the reasons. Reports in 2026 said Microsoft had placed around 400 to 500 India employees under its PIP process. Oracle, meanwhile, was reported to be preparing fresh workforce reductions in India. At TCS, managers were reportedly told to place 5% of staff in a lowest-performance “D band”. That band carried cuts to variable pay, removal from client projects and mandatory PIPs. Meanwhile, Indian IT workers and commentators have alleged that performance improvement plans are widely misused to pressure people to resign. Often, they say, there is no clear link to actual performance.
The employee experience matches the headlines. HR Katha’s reporting on why so few people survive the PIP points to the same cause. Where continuous feedback is absent, employees are shocked when the plan lands. In addition, CHROs themselves admit the label now carries a punitive connotation, whatever the policy says. So the debate is not really about PIPs as exit tools in India versus PIPs as development. It is about whether your organisation can tell, honestly, which one it is running.
There is also a quiet legal dimension. Indian employment disputes increasingly examine whether a termination for poor performance followed a documented, good-faith improvement process. Therefore, a PIP that was theatre does not just damage trust. It weakens the very record it was supposed to create.
When to put an employee on a PIP (and when not to)
Most PIP damage happens before the document is written, because the wrong cases get routed into it. Deciding when to put an employee on a PIP starts with three exclusions.
- Not for conduct. Integrity violations, harassment and wilful negligence are disciplinary matters. Routing them through a performance process confuses the record and delays the right action.
- Not for role mismatch you created. If the role changed under the person, or they were promoted without preparation, the first fix is role design and training. A warning dressed as support fixes nothing. We see this constantly with new managers; our article on why first-time managers fail covers that pattern.
- Not for headcount. If the real driver is cost, a PIP is the wrong instrument and everyone will know it. Restructuring has its own honest process.
What remains is the legitimate case. That means a capable person, in a viable role, with a real and recent gap that feedback alone has not closed. That is when a PIP is the right tool. As a filter, ask one question first. Has this person already heard, clearly and more than once, what is not working? If the answer is no, the PIP would be their first feedback. That is a manager failure, not an employee one.
The PIP process in India: six steps that hold up
Here is the PIP process in India we recommend to HR leaders, in sequence. It is deliberately boring, because fairness lives in the boring parts.
- 1. Evidence before conversation. Assemble specific, dated examples of the gap against the role’s stated expectations. No adjectives, no hearsay.
- 2. The pre-PIP conversation. The manager names the gap and the possibility of a PIP, and listens. Sometimes this conversation alone fixes it. Sometimes it surfaces a cause, such as health, workload or a broken process, that changes the route entirely.
- 3. Write goals the employee can actually reach. Two or three measurable targets, within the employee’s control, achievable in the window. Thirty days is rarely enough for complex roles; 60 to 90 days is the defensible norm in Indian companies.
- 4. Name the support. Training, a mentor, reduced interruptions, weekly manager time. A plan that demands improvement but funds nothing is an accusation with a deadline.
- 5. Review weekly, in writing. Short, documented check-ins beat a single verdict at the end. Moreover, they protect both sides.
- 6. Close it honestly, both ways. If the targets are met, say so formally and move on. A cleared PIP that shadows someone’s rating next cycle proves the cynics right. If they are not met, the exit conversation is at least honest, documented and humane.
How to design a fair PIP: the three tests
Beyond process, how to design a fair PIP comes down to three tests. We apply them whenever we review a client’s draft plans. Designing a fair PIP means passing all three, not two.
- The surprise test. Would the employee be surprised by anything in this document? If yes, the feedback system failed upstream, and the PIP inherits that failure. Nothing in a fair PIP should be new information.
- The support test. Could a neutral reader point to what the company is contributing? Time, coaching, training and access are the difference between an improvement plan and a countdown. This is also where manager capability decides outcomes. A manager who cannot give usable feedback cannot run a fair PIP. That is why we pair PIP redesign with coaching skills for managers.
- The intent test. If the employee hits every target, will they genuinely continue in good standing? If leadership cannot answer yes out loud, stop. Run the honest process instead. A fair PIP in India now has an audience far beyond the two people in the room.
Notice that none of these tests requires new software or policy. Even so, most plans we review fail at least one, and the surprise test fails most often.
What your PIP volume is telling you
Finally, zoom out. A spike in performance improvement plans is a symptom, and the disease is usually upstream. Usually it is goals that were never clear, ratings that were never honest, or hard conversations postponed for a year. If PIPs cluster under particular managers or functions, that is diagnostic data. Accordingly, we treat a rising PIP count as a reason to examine the whole system. That is the work described on our PMS redesign page, where rating philosophy and calibration get rebuilt together. The goal is simple to state. A performance improvement plan in India should be rare, fair when used, and survivable. The best-run companies prove all three are possible at once.
Frequently asked questions
What is a performance improvement plan in simple terms?
A written, time-bound agreement with four parts: the specific gap, measurable targets, the company’s support, and a review date. It is meant to close a gap, not to document an exit.
Is a PIP always a step towards exit?
No, but it has been misused that way often enough in India that employees assume it. The intent test settles it. If meeting every target genuinely restores good standing, the PIP is real. If not, it is an exit process wearing the wrong name.
How long should a PIP run in Indian companies?
Sixty to ninety days for most roles. Thirty-day plans rarely give enough time to demonstrate change in complex work. Short windows are also one of the strongest signals that the outcome was pre-decided.
When should a company not use a PIP?
For conduct and integrity issues, for role mismatches the organisation created, and for cost-driven headcount decisions. Each has its own honest process. Borrowing the PIP for them corrupts the tool for everyone else.
Sources
- Goodreturns, Tech layoffs 2026: Oracle may cut jobs in India; Microsoft reportedly puts 400–500 employees under PIP
- People Matters, TCS asks managers to place 5% of employees in lowest performance band after major layoffs
- Analytics India Magazine, How Indian IT turned performance reviews into an exit tool
- HR Katha, Why very few people survive the PIP
- SHRM India, Performance issue or fireable offense: know when to skip the PIP